NE 70th St and I-5 Crossing Improvements
Updated: September 6, 2019
This project is complete!
The NE 70th St and I-5 Crossing Improvement Project is now complete. New crosswalks and stop signs at 6th Ave NE and 8th Ave NE along NE 70th St are complete and open for use. Crossing improvements to make a new protected bike lane and a pedestrian walkway over the I-5 overpass on NE 70th St are also open. Crews will return in the next few months to add pedestrian symbols to the new pedestrian lane on the overpass.
Thank you for your patience and cooperation while we constructed this project. This project would not have been possible without the community's help and guidance. We hope you enjoy these new safety enhancements for people walking and biking.
Entrance ramp to I-5 before crossing improvements.
Entrance ramp to I-5 after crossing improvements.
Intersection of 8th Ave NE and NE 70th St before crossing improvements.
Intersection of 8th Ave NE and NE 70th St after crossing improvements.
Intersection of 6th Ave NE and NE 70th St before crossing improvements.
Intersection of 6th Ave NE and NE 70th St after crossing improvements.
Overpass before protected bike lane and pedestrian path improvements.
Overpass after protected bike lane and pedestrian path improvements.
Project Overview
Crossing improvements for people walking, biking, and driving are coming to NE 70th St between 6th Ave NE and 12th Ave NE. Improvements between 6th Ave NE and 8th Ave NE were requested by the community as part of the City's Neighborhood Street Fund (NSF). These improvements include new all-way stops at the intersections of NE 70th St at 8th Ave NE and 6th Ave NE, new crosswalks, a walkway, and protected bike lanes in both directions. We're also adding a protected bike lane on the south side of NE 70th St between 8th Ave NE and 12th Ave NE, and adding a neighborhood greenway connection on NE 70th between 12th Ave NE and 15th Ave NE. To facilitate the new bike lanes, parking will be consolidated to the south side of NE 70th St between 8th Ave NE and Roosevelt Way NE and removed between Roosevelt Way NE and 12th Ave NE on both sides of the street. Driveway access will be maintained.
Elements
- New all-way stops at the intersections of NE 70th St at 8th Ave NE and 6th Ave NE
- New curb bulbs and ramps at 6th Ave NE and 8th Ave NE
- A painted walkway on the north side of the I-5 overpass
- Protected bike lanes in both directions between 6th Ave NE and 8th Ave NE
- Protected bike lane (eastbound) between 8th Ave NE and 12th Ave NE
- Neighborhood greenway connection, including speed humps and new stop signs between 12th Ave NE and 15th Ave NE
- New street lights on the southwest corner of NE 71st St and 6th Ave NE and the northeast corner of NE 70th St and 8th Ave NE
Benefits
- Adds predictability for all travelers as they move through the NE 70th St and 8th Ave NE intersection
- Enhances safety for people walking and biking
- Provides a continuous sidewalk network on the north side of the street
- Provides east/est bike connections from Green Lake to 15th Ave NE
Neighborhood greenway connection on NE 70th St between 12th Ave NE and 15th Ave NE
Between 12th Ave NE and 15th Ave NE, we plan to add a neighborhood greenway to connect the new NSF project and the protected bike lane on NE 70th to the future protected bike lanes that are being added as part of the 15th Ave NE paving project. Greenway elements include adding speed humps and signage.
Design
- Bike lanes are being added on NE 70th St between 8th Ave NE and 12th Ave NE
- A protected bike lane (eastbound) will be installed on the south side of the street, and a bike lane (westbound) added to the north side of the street
- Between 8th Ave NE and Roosevelt Way NE parking will be consolidated to the south side of the street
- Between Roosevelt Way NE and 12th Ave NE parking will be removed from both sides of the street
Schedule
2016
NSF applications and project selection
2017
Project design
2018
Project construction
2019
NSF applications and project selection (new cycle)
Project Funding
Funding comes from the 2015 voter-approved, 9-year Levy to Move Seattle, which will improve safety for all travelers, maintain streets and bridges, and invest in reliable, affordable travel options for a growing city. The levy includes $24 million to continue the Neighborhood Street Fund program over the 9 years.
Date | Audience |
---|---|
September 26, 2017 | Roosevelt Neighborhood Association Briefing |
September 13, 2017 | Green Lake Community Council Presentation |
May 18, 2017 | NE 65th Vision Zero Project Neighborhood Transportation Forum |
March 28, 2017 | Public Meeting |
February 28, 2017 | NE 65th Vision Zero Project Neighborhood Transportation Forum |
Materials
Construction Notice (October 2018 )
Fact Sheet (September 2017)
Fact Sheet (May 2017)
Fact Sheet (February 2017)
SDOT Project Review Document
To request information in another format:
We are designing and building a transportation project proposed by your neighbors to make it safer for people walking and biking and to strengthen community. To learn more about the project or request translations call (206) 684-7623
Estamos disenando y construyendo un proyecto de transporte propuesto por nuestros vecinos a fin de que sea mas seguro para que las personas caminen y monten bicicleta y asimismo fortalecer a la comunidad. Para obtener mayor informacion acerca del proyecto o para solicitar transporte llamar a: (206) 684-7623
Chúng tôi đang thiết kế và xây dựng một dự án giao thông đề xuất bởi chính những người hàng xóm của quý vị nhằm làm cho việc đi bộ và đi xe đạp trở nên an toàn hơn và cộng đồng vững mạnh hơn. Để tìm hiểu thêm về dự án hoặc yêu cầu các bản dịch, hãy gọi (206) 684-7623
我們正在設計並建造一個由您的鄰居提議的交通計畫,這個計畫旨在改善人們的步行及?車安全,並強化社區。 如需進一步瞭解這項計畫,或是申請翻譯服務,請撥打 (206) 684-7623
我们正在设计并建造一个由您的邻居提议的交通计划,这个计划旨在改善人们的步行及?车安全,并强化社区。如需进一步了解这项计划,或是申请翻译服务,请拨打 (206) 684-7623
በእግራቸው ለሚጓዙ እና ብስክሌት ለሚጋልቡ ሰዎች ይበልጥ ለደኅንነታቸው አስተማማኝ እንዲሆን በእርስዎ ጎረቤቶች በቀረበ ንድፈ ሐሳብ ላይ በመመርኮዝ የትራንስፖርት አገልግሎት ፕሮጄክትን በመንደፍ እና በማዘጋጀት ላይ ነን። ስለ ፕሮጄክቱ የበለጠ ለማወቅ ወይም ትርጉም አገልግሎት ለማግኘት ጥያቄ ለማቅረብ ወደዚህ ይደውሉ (206) 684-7623
በእግሮም ንዝጓዓዙን ብሽክልታ ንዝጥቀሙን ሰባት ውሑስንኦም ንምሕላውን እቲ ማሕበረሰብ ንምጥንኻርን ብጎረባብትኻ ዝተተለመ ናይ መጓዓዝያ ፕሮጀክት ዲዛይን ነውጽን ንሃንጽን ኣሎና፡፡ ብዛዕባ እቲ ፕሮጀክት ዝበለጸ ሓበሬታ ንምርካብ ወይ ናይ ናብ መጓዝያ ንምድዋል ሓገዝ ንምርካብ (206) 684-7623
Nuti Pirojektii geejjibaa ollaawwan keessaniin gaafataman kan wixineessinuu fi ijaarruuf, namoota deemaniifi isaan bishikilitii ofaniif daandii nagaa taasisuufi hawaasichas cimsuudhaaf. Waa’ee pirojektichaa caalaa baruuf ykn geejjiba gaafachuuf nuuf bilbilaa (206) 684-7623
Waxaynu nakhshadaynaynaa oona dhisaynaa mashruuc gaadiid ay soo jeediyeen dadka deriskaaga ah si aynu ugaga dhigno mid ammaan ah dadka soconaya iyo kuwa baaskiilada wata iyo si aynu u xoojino jaaliyada. Si aad u oggaatid inbaddan oo ku saabsan mashruuca ama u codsatid waxyaabo turjuban soo wac (206) 684-7623
Kami ay nagdidisenyo at nagtatayo ng isang proyekto para sa transportasyon na namungkahi ng inyong mga kapitbahay para gawing mas ligtas para sa mga taong naglalakad at nagbibisikleta at para mapatatag ang komunidad. Upang higit pang matutunan ang tungkol sa proyekto o humiling ng mga pagsasalin-wika, tumawag sa (206) 684-7623