Ballard Ave Mobility and Access Improvements
Updated August 27, 2024
What's happening now?
Over the past several months, we’ve worked with local businesses and project partners to understand how the different phases of improvements along Ballard Ave NE have been working. This input informed the design for the final phase of interim mobility and access refinements.
Project Background and Purpose
The Ballard Ave Café Street improvements are being made through a phased and iterative process that started in 2020 as noted below. The project area is Ballard Ave NW between 20th Ave NW and 22nd Ave NW.
- Covid Safe Starts Response (2020)
- Charrette #1 (2021)
- Phase 1 Implementation of Mobility and Access Improvements (2022)
- Charrette #2, Online Survey, Public Life Study (2022)
- Phase 2 Mobility and Access Refinements (2023)
- Phase 3 Final Interim Refinements (2024)
2020 Covid Safe Starts Response: During the COVID-19 pandemic, restaurants and other businesses built curbspace cafes, or pergolas, within the roadway on Ballard Ave under the Safe Starts Permit Program. Over the summer, SDOT made quick install pedestrian-focused and business-friendly interim street improvements to Ballard Ave NW between 20th Ave NW and 22nd Ave NW around these structures.
2021 Charette #1: In 2021, through a Design Charette hosted by Councilmember Strauss, we met with Ballard community members and businesses to hear their feedback about the changes implemented in 2020. We heard that the changes improved the experience for customers and visitors and made business deliveries easier. Participants also asked us to further improve safety for people walking and de-clutter signs in the area. Charette recommendations were broken into three areas: short-term improvements, interim policies and allowances, and long-term permanent policies, standards, and design.
2022 Phase 1 Implementation: Phase 1 Mobility and Access Improvements implemented several short-term improvements developed during the first Design Charrette and allowed us to test ideas, get feedback through additional engagement. Phase 1 improvements included new all-way stops, interim curb bulbs and planters, flexible porous paving around street trees, and signage decluttering.
2022 Charette #2: Shortly after the interim improvements were installed, Council Member Strauss hosted a second Design Charette to reflect on what was working well, what interim improvements needed to be revised or refined, and the long-term design of the street and café structures. We also conducted an online survey (with 1,350 people responding) and a Public Life Study for the corridor. We heard that the community overwhelmingly loved the interim improvements, wanted greater legibility for pedestrians at intersections, particularly during the evenings, and more space dedicated to seating and walking. We also observed that three out of four people traveling along the street are pedestrians, and pedestrian volumes were similar to pre-pandemic counts on many of our busiest pedestrian streets in Capitol Hill, Belltown, and Chinatown International District!
Phase 2 (2023) Implementation: 2023 interim refinements improved pedestrian visibility at the intersection of Ballard Ave NW and 20th Ave NW, included curbside adjustments to increase load/unload zones, ADA parking, and food pick-up priority areas, and increased and defined space for people walking and rolling using removable flexible delineators. Input after installation led to early revisions that included the removal of delineator posts and further curbside revisions to support businesses.
Phase 3 (2024) Implementation: Final interim refinements aim to better delineate street space to maintain pedestrian visibility and safety, apply curbside adjustments, and maintain one-way vehicular movements. We are also coordinating proposed changes with the Ballard Farmers Market to support the market and vendors’ ongoing success.
Phase 3 (2024) Final Interim Refinements
- Maintaining pedestrian visibility and safety at intersections.
- Further support for freight/delivery and business access with curbside adjustments.
- Exploring community partnerships to add movable benches and tables in newly created public space. Addition of bike parking racks, and bike share and scooter share parking spaces to serve Ballard Ave NW.
- Maintaining the one northbound travel lane.
2024 Phase 3 Final Interim Refinements:
Phase 3 Timeline
September 2024
- Phase 3 implementation
Project Files
July 2022 Construction Notice Flyer
May 2022 Historic District Briefing
August 2021 Ballard Ave Design Charette Final Draft Report
In the News
July 5, 2023, SDOT Blog, More street improvements are coming to the Ballard Ave Café Street!
July 20, 2022, SDOT Blog, Coming soon to Ballard Ave NW: improvements for people walking and nearby businesses
June 10, 2022, My Ballard, Pedestrian improvements and traffic updates coming to Ballard Ave Cafe Street
June 9, 2022, Council Connection, Councilmember Strauss and Stakeholders Praise Next Steps for the Ballard Ave Café Street
June 9, 2022, Puget Sound Business Journal, Ballard Avenue a test of what could be next for Seattle street dining
June 6, 2022, SDOT Blog, This summer, we’re improving Ballard Ave NW for people walking and nearby businesses